eprintid: 59665 rev_number: 10 eprint_status: archive userid: 12460 dir: disk0/00/05/96/65 datestamp: 2023-07-07 03:01:13 lastmod: 2023-07-07 03:01:13 status_changed: 2023-07-07 03:01:13 type: thesis metadata_visibility: show contact_email: muh.khabib@uin-suka.ac.id creators_name: Taufik Alfuad, NIM.: 19106060035 title: PENJADWALAN PRODUKSI FLOWSHOP DENGAN METODE CAMPBELL, DUDEK, & SMITH (CDS), PALMER, DAN DANNENBRING DALAM MEMINIMALKAN TOTAL WAKTU PRODUKSI (MAKESPAN) STUDI KASUS (PT. NATURINDO FRESH KULON PROGO) ispublished: pub subjects: TA divisions: jur_tind full_text_status: restricted keywords: Makespan, Penjadwalan, Urutan Job, Campbell, Dudek, & Smith (Cds), Palmer, Dannenbring note: Pembimbing: Ir. Khusna Dwijayanti, ST., M.Eng., Ph.D, ASEAN abstract: PT. Naturindo Fresh is a company that produces and distributes original Indonesian herbal medicines with a focus on the health sector. Production scheduling is carried out by taking into account product stock in inventory and the number of orders from consumers. Production scheduling at this company does not yet have a definite schedule. The production schedule is only in the form of what types of products will be produced within 1 month but in the process, employees are free to choose which products will be produced first (random). The purpose of this research is to determine the job order and make the resulting pan based on the method used. The research method in this study was carried out using observation, interviews, documentation, and literature study. The company's actual scheduling produces a makeup of 30,725.08 minutes. The Campbell, Dudek, & Smith (CDS) method produces a makespan of 30,634.18 minutes with job order 7 – 10 –1– 20 – 21 – 24 – 23 – 5 – 18 – 19 – 4 – 8 – 9 – 3 – 25 – 16 – 17 – 22 – 15 – 12 – 13 – 26 – 14 – 2 – 11 – 6. Palmer's method produces a makeup of 30,743.75 minutes with job order 5 – 19 – 24 – 4 – 18 – 15 – 16 – 23 – 9 – 20 – 7 – 17 – 10 – 8 – 22 – 21 – 3 – 1 – 25 – 26 – 12 – 13 – 14 – 2 – 11 – 6. The Dannenbring method also makes a pan of 30,743.75 minutes with job order 5 – 19 – 15 – 4 – 18 – 16 – 24 – 9 – 17 – 23 – 20 – 22 – 8 – 12 – 7 – 10 – 3 – 21 – 1 – 13 – 25 – 26 – 14 – 11 – 2 – 6 So that with the results of this method CDS has the smallest makespan which can be a recommendation to be applied to scheduling PT. Naturindo Fresh Kulon Progo. date: 2023-05-30 date_type: published pages: 238 institution: UIN SUNAN KALIJAGA YOGYAKARTA department: FAKULTAS SAINS DAN TEKNOLOGI thesis_type: skripsi thesis_name: other citation: Taufik Alfuad, NIM.: 19106060035 (2023) PENJADWALAN PRODUKSI FLOWSHOP DENGAN METODE CAMPBELL, DUDEK, & SMITH (CDS), PALMER, DAN DANNENBRING DALAM MEMINIMALKAN TOTAL WAKTU PRODUKSI (MAKESPAN) STUDI KASUS (PT. NATURINDO FRESH KULON PROGO). Skripsi thesis, UIN SUNAN KALIJAGA YOGYAKARTA. document_url: https://digilib.uin-suka.ac.id/id/eprint/59665/1/19106060035_BAB-I_IV-atau-V_DAFTAR-PUSTAKA.pdf document_url: https://digilib.uin-suka.ac.id/id/eprint/59665/2/19106060035_BAB-II_sampai_SEBELUM-BAB-TERAKHIR.pdf