eprintid: 71819 rev_number: 10 eprint_status: archive userid: 12460 dir: disk0/00/07/18/19 datestamp: 2025-07-14 04:24:58 lastmod: 2025-07-14 04:24:58 status_changed: 2025-07-14 04:24:58 type: thesis metadata_visibility: show contact_email: muh.khabib@uin-suka.ac.id creators_name: Roikhatul Janah, NIM.: 21106060013 title: ANALISIS PEMBOROSAN DALAM PROSES PRODUKSI PRECAST U-DITCH MENGGUNAKAN PENDEKATAN LEAN MANUFACTURINGDAN ANALYTICAL HIERARCHY PROCESS (AHP) ispublished: pub subjects: 670 divisions: jur_tind full_text_status: restricted keywords: AHP, FMEA, Inventory, Lean Manufacturing, Precast U-ditch note: Dr. Ir. Ira Setyaningsih, S.T., M.Sc, IPM, ASEAN Eng abstract: The rapid development of infrastructure in Indonesia has driven a growing demand for precast concrete products, one of which is the precast U-ditch. PT Surya Karya Setiabudi, as a manufacturer of precast U-ditch, continues to face challenges in its production process, particularly related to waste that impacts efficiency and product quality. This study aims to identify types of waste and determine improvement actions using the Lean Manufacturing approach, supported by the Analytical Hierarchy Process (AHP) and Failure Mode and Effects Analysis (FMEA) methods. The results show that the Process Cycle Efficiency (PCE) value is 29.42%, indicating that only 29.42% of the total process time adds value, while the remaining time consists of non-value-added and necessary non-value-added activities. Five types of waste were identified: inventory, overproduction, motion, waiting, and transportation. Based on AHP weighting, inventory waste ranked highest with a weight of 44%. This waste is caused by unstructured production systems, poor warehouse layout, and limitations in production planning management. Based on FMEA analysis, the prioritized improvement steps include refining production strategies, reorganizing warehouse areas, and strengthening operational systems through SOP development and the use of historical data. The results of this study are expected to serve as a reference for improving operational efficiency and productivity in the precast concrete industry, particularly in the production of precast U-ditch at PT Surya Karya Setiabudi. date: 2025-06-10 date_type: published pages: 108 institution: UIN SUNAN KALIJAGA YOGYAKARTA department: FAKULTAS SAINS DAN TEKNOLOGI thesis_type: skripsi thesis_name: other citation: Roikhatul Janah, NIM.: 21106060013 (2025) ANALISIS PEMBOROSAN DALAM PROSES PRODUKSI PRECAST U-DITCH MENGGUNAKAN PENDEKATAN LEAN MANUFACTURINGDAN ANALYTICAL HIERARCHY PROCESS (AHP). Skripsi thesis, UIN SUNAN KALIJAGA YOGYAKARTA. document_url: https://digilib.uin-suka.ac.id/id/eprint/71819/1/21106060013_BAB-I_IV-atau-V_DAFTAR-PUSTAKA.pdf document_url: https://digilib.uin-suka.ac.id/id/eprint/71819/2/21106060013_BAB-II_sampai_SEBELUM-BAB-TERAKHIR.pdf