eprintid: 76867 rev_number: 10 eprint_status: archive userid: 12460 dir: disk0/00/07/68/67 datestamp: 2026-06-17 01:48:36 lastmod: 2026-06-17 01:48:36 status_changed: 2026-06-17 01:48:36 type: thesis metadata_visibility: show contact_email: muh.khabib@uin-suka.ac.id creators_name: Nur Khodhori Mahesa Ananta, NIM.: 22106060001 title: PERANCANGAN APLIKASI REAL-TIME DYNAMIC SCHEDULING BERBASIS VENDOR UNTUK MEMBANTU PENENTUAN DUE DATE PESANAN (STUDI KASUS: DIVISI PPIC, CV FUTAKE INDONESIA, KLATEN) ispublished: pub subjects: 005.36. divisions: jur_tind full_text_status: restricted keywords: Real-Time Dynamic Scheduling, Decision Support System, Enumerasi Skenario, Weighted Tardiness, Parallel Machine Scheduling note: Prof. Dr. Ir. Dwi Agustina Kurniawati, S.T., M.T., Ph.D., IPM, ASEAN Eng. yang abstract: The metal casting industry that adopts a make-to-order strategy faces complex job shop scheduling challenges due to the high variation in orders, processing durations, and due dates. CV Futake Indonesia, as a manufacturing retailer of metal-derived products and street furniture, manages orders through vendor partnerships using a scheduling mechanism that still relies on the FCFS rule based on PO release dates. This approach has not been able to accommodate the dynamic nature of order arrivals with varying priority levels and due dates, resulting in 190 of 228 orders or 83% experiencing completion delays in 2025. This research aims to design a webbased Real-Time Dynamic Scheduling Application as a decision support system that assists Job Estimators in determining proportional order due dates. The application is built using HTML, CSS, and JavaScript within a single-page application architecture running on localhost, integrating four user roles: Job Estimator (Futake), Job Estimator (Vendor), Production Supervisor, and Sales. The adopted approach combines a two slot parallel vendor processing model, scenario enumeration, and a queue priority constraint as a hard constraint, with the objective function of minimizing ΔTW. Simulation results across four job datasets show that the system is able to generate new job insertion recommendations along with completion time and due date estimates that align with actual vendor conditions, while functionality testing verified that all six main menus operate according to specifications. This application is expected to become an adaptive, collaborative, and integrated scheduling decision-making instrument between Futake and its vendors. date: 2026-05-29 date_type: published pages: 247 institution: UIN SUNAN KALIJAGA YOGYAKARTA department: FAKULTAS SAINS DAN TEKNOLOGI thesis_type: skripsi thesis_name: other citation: Nur Khodhori Mahesa Ananta, NIM.: 22106060001 (2026) PERANCANGAN APLIKASI REAL-TIME DYNAMIC SCHEDULING BERBASIS VENDOR UNTUK MEMBANTU PENENTUAN DUE DATE PESANAN (STUDI KASUS: DIVISI PPIC, CV FUTAKE INDONESIA, KLATEN). Skripsi thesis, UIN SUNAN KALIJAGA YOGYAKARTA. document_url: https://digilib.uin-suka.ac.id/id/eprint/76867/1/22106060001_BAB-I_IV-atau-V_DAFTAR-PUSTAKA.pdf document_url: https://digilib.uin-suka.ac.id/id/eprint/76867/2/22106060001_BAB-II_sampai_SEBELUM-BAB-TERAKHIR.pdf