PENJADWALAN PRODUKSI FLOWSHOP DENGAN METODE CAMPBELL, DUDEK, & SMITH (CDS), PALMER, DAN DANNENBRING DALAM MEMINIMALKAN TOTAL WAKTU PRODUKSI (MAKESPAN) STUDI KASUS (PT. NATURINDO FRESH KULON PROGO)

Taufik Alfuad, NIM.: 19106060035 (2023) PENJADWALAN PRODUKSI FLOWSHOP DENGAN METODE CAMPBELL, DUDEK, & SMITH (CDS), PALMER, DAN DANNENBRING DALAM MEMINIMALKAN TOTAL WAKTU PRODUKSI (MAKESPAN) STUDI KASUS (PT. NATURINDO FRESH KULON PROGO). Skripsi thesis, UIN SUNAN KALIJAGA YOGYAKARTA.

[img]
Preview
Text (PENJADWALAN PRODUKSI FLOWSHOP DENGAN METODE CAMPBELL, DUDEK, & SMITH (CDS), PALMER, DAN DANNENBRING DALAM MEMINIMALKAN TOTAL WAKTU PRODUKSI (MAKESPAN) STUDI KASUS (PT. NATURINDO FRESH KULON PROGO))
19106060035_BAB-I_IV-atau-V_DAFTAR-PUSTAKA.pdf - Published Version

Download (2MB) | Preview
[img] Text (PENJADWALAN PRODUKSI FLOWSHOP DENGAN METODE CAMPBELL, DUDEK, & SMITH (CDS), PALMER, DAN DANNENBRING DALAM MEMINIMALKAN TOTAL WAKTU PRODUKSI (MAKESPAN) STUDI KASUS (PT. NATURINDO FRESH KULON PROGO))
19106060035_BAB-II_sampai_SEBELUM-BAB-TERAKHIR.pdf - Published Version
Restricted to Registered users only

Download (5MB) | Request a copy

Abstract

PT. Naturindo Fresh is a company that produces and distributes original Indonesian herbal medicines with a focus on the health sector. Production scheduling is carried out by taking into account product stock in inventory and the number of orders from consumers. Production scheduling at this company does not yet have a definite schedule. The production schedule is only in the form of what types of products will be produced within 1 month but in the process, employees are free to choose which products will be produced first (random). The purpose of this research is to determine the job order and make the resulting pan based on the method used. The research method in this study was carried out using observation, interviews, documentation, and literature study. The company's actual scheduling produces a makeup of 30,725.08 minutes. The Campbell, Dudek, & Smith (CDS) method produces a makespan of 30,634.18 minutes with job order 7 – 10 –1– 20 – 21 – 24 – 23 – 5 – 18 – 19 – 4 – 8 – 9 – 3 – 25 – 16 – 17 – 22 – 15 – 12 – 13 – 26 – 14 – 2 – 11 – 6. Palmer's method produces a makeup of 30,743.75 minutes with job order 5 – 19 – 24 – 4 – 18 – 15 – 16 – 23 – 9 – 20 – 7 – 17 – 10 – 8 – 22 – 21 – 3 – 1 – 25 – 26 – 12 – 13 – 14 – 2 – 11 – 6. The Dannenbring method also makes a pan of 30,743.75 minutes with job order 5 – 19 – 15 – 4 – 18 – 16 – 24 – 9 – 17 – 23 – 20 – 22 – 8 – 12 – 7 – 10 – 3 – 21 – 1 – 13 – 25 – 26 – 14 – 11 – 2 – 6 So that with the results of this method CDS has the smallest makespan which can be a recommendation to be applied to scheduling PT. Naturindo Fresh Kulon Progo.

Item Type: Thesis (Skripsi)
Additional Information: Pembimbing: Ir. Khusna Dwijayanti, ST., M.Eng., Ph.D, ASEAN
Uncontrolled Keywords: Makespan, Penjadwalan, Urutan Job, Campbell, Dudek, & Smith (Cds), Palmer, Dannenbring
Subjects: Tehnik Industri
Divisions: Fakultas Sains dan Teknologi > Teknik Industri (S1)
Depositing User: Muh Khabib, SIP.
Date Deposited: 07 Jul 2023 10:01
Last Modified: 07 Jul 2023 10:01
URI: http://digilib.uin-suka.ac.id/id/eprint/59665

Share this knowledge with your friends :

Actions (login required)

View Item View Item
Chat Kak Imum