RANCANG BANGUN SISTEM INFORMASI MANAJEMEN BIMBINGAN HAJI DAN UMROH DI KBIH MULTAZAM MENGGUNAKAN METODE PROTOTYPING

LIES TSANIA FIRHATUSSHIAMY, NIM. 14650009 (2018) RANCANG BANGUN SISTEM INFORMASI MANAJEMEN BIMBINGAN HAJI DAN UMROH DI KBIH MULTAZAM MENGGUNAKAN METODE PROTOTYPING. Skripsi thesis, UIN SUNAN KALIJAGA YOGYAKARTA.

[img]
Preview
Text (RANCANG BANGUN SISTEM INFORMASI MANAJEMEN BIMBINGAN HAJI DAN UMROH DI KBIH MULTAZAM MENGGUNAKAN METODE PROTOTYPING)
14650009_BAB-I_BAB-VII_DAFTAR-PUSTAKA.pdf - Published Version

Download (2MB) | Preview
[img] Text (RANCANG BANGUN SISTEM INFORMASI MANAJEMEN BIMBINGAN HAJI DAN UMROH DI KBIH MULTAZAM MENGGUNAKAN METODE PROTOTYPING)
14650009_BAB-II_sampai_SEBELUM-BAB-TERAKHIR.pdf - Published Version
Restricted to Registered users only

Download (8MB)

Abstract

KBIH Multazam is a specialized institution for organizing Hajj and Umrah that is still manually processing their data and not yet computerized. The said data is still in the form of data that was made through Excel so its difficult for the employee to summarize the data. In this case, a renewal of the data processing system and information in KBIH Multazam, which the benefits will ease the employee at doing the data processing and keeping the big amount of data at once. The management information system that is going to be built is using prototyping method because this method uses an approach to make a program quickly and gradually so it can be evaluated immediately by the client. The prototyping method is done with several steps, that is communication, quick plan, modelling quick design, construction of prototype, and deployment delivery & feedback. the communication step is the first step done by doing interview to the client about the system that is going to be built. The quick plan step is to identify the system needs and continued with the modelling quick design step that is a quick design in the form of the design of the system that is going to be built. The construction of prototype step is to construct the prototype of the system, and then the deployment & feedback step that is the system evaluation step by the client. The result from this research is the system is able to process the hajj pilgrim data, the umrah pilgrim data, the employee data and the alumni recitation data quickly. Testing is done by testing the functionality and the usability of the system. The result from the system functionality test is 100%, it shows that the system is already working with its own respective functions. While the system usability test shows that 64,3% strongly agree in the easy to use admin system and 53,3% strongly agree in the easy to use employee system.

Item Type: Thesis (Skripsi)
Additional Information: Agus Mulyanto, S.Si., M.Kom.
Uncontrolled Keywords: Management Information System, KBIH Multazam, Prototyping.
Subjects: Tehnik Informatika
Divisions: Fakultas Sains dan Teknologi > Teknik Informatika (S1)
Depositing User: H. Zaenal Arifin, S.Sos.I., S.IPI.
Date Deposited: 21 Mar 2019 11:30
Last Modified: 21 Mar 2019 11:30
URI: http://digilib.uin-suka.ac.id/id/eprint/34014

Share this knowledge with your friends :

Actions (login required)

View Item View Item
Chat Kak Imum